Free Electrical Subcontractor Agreement Template
Electrical scope arguments usually start with design responsibility and long-lead gear. A few quick questions produce a document ready to print or e-sign.
- Download as PDF and Word
- E-sign included
Monday - Friday 9AM – 6PM EST
Electrical scope arguments usually start with design responsibility and long-lead gear. A few quick questions produce a document ready to print or e-sign.
Choose the state or form type you need to start.
Answer a few simple questions to customize your form.
Download or print your custom document in PDF or Word.
An electrical subcontractor agreement sets terms between a contractor and a licensed electrical firm taking part of a job. It records the scope, the price, the safety duties, and who answers for a design that will not work.
Electrical work carries two risks at once. A mistake can injure somebody on the day, and it can also sit hidden inside a wall for a decade.
Money behaves differently here as well. Switchgear and panels carry lead times measured in months, so procurement decisions bind the schedule long before anyone pulls wire.
Scale changes the paperwork too. A service upgrade on one house needs less than a fit-out with a dozen panels. Both still need the design question answered.
The electrical firm answers to you rather than to the property owner. Your contract upstream stays where it is, and this document decides what travels down.
Most electrical disputes trace back to a boundary nobody drew. So draw them explicitly.
State whether the subcontractor designs the installation or installs to a drawing you supply. Design-build shifts real liability, and the fee should reflect that.
Say who calculated the load and who answers if the service proves undersized. An installer following a flawed drawing sits in a different position from one who produced it.
Decide who runs data, fire alarm, access control, and audio-visual cabling. These fall between trades and get dropped more often than any other scope.
Name who supplies fixtures, and who installs owner-purchased items. Then say who answers when a supplied fitting fails.
List what the subcontractor does not do: patching, painting, trenching, or crane time. Unlisted work turns into an assumption. Trenching and concrete cutting in particular get assumed onto the electrical package more than anything else.
Licensing and permit rules for electrical work vary by state and city. So confirm with your local building department who must hold the license and who applies for the permit.
Procurement decides the schedule on most electrical packages. Handle it in the agreement rather than in a phone call.
Name who buys switchgear, panels, and transformers. Also say who tracks delivery and who reports a slip.
Long lead times invite price movement. Agree whether quoted prices hold, for how long, and who absorbs an increase beyond that point.
Say where gear waits, who unloads it, and who insures it before installation. Equipment sitting in a yard still belongs to somebody.
Where a specified item becomes unavailable, require written approval for an alternative. That approval should come from whoever owns the design.
Gear arriving before the room is ready costs storage and double handling. Agree who confirms site readiness before a delivery leaves the supplier.
Construction power is its own scope. Decide who installs it, who pays the bill, and who maintains it through the job.
Safety obligations do not transfer with a signature. So the agreement should record practices rather than promises.
Require in writing:
An electrical subcontractor agreement should also name who controls isolation on a shared site. Where several trades work off one panel, somebody has to own the switching.
Tip: Agree the permit-to-work process before the first energized task, not during it. A process invented under pressure is the one that gets skipped.
Every finished installation still needs somebody to sign it off, and somebody to explain it years later.
Say who applies to the serving utility, who schedules the meter, and who attends. Utility timelines rarely bend around a construction schedule.
Name who meets the inspector and who clears correction notices. Also say who pays when the failure belongs to the subcontractor.
Require the tests suited to the installation, with results recorded. Say who witnesses them and who receives the certificates. Also say who pays for retesting after a failure.
Require accurate circuit directories and device labels at handover. A mislabeled panel costs somebody an afternoon every year for the life of the building.
Set a deadline for marked-up drawings and name the format you need. Drawings produced months later stop matching what sits in the wall.
Electrical packages move through change orders more than most trades. Agree the mechanics before you need them.
State whether the price is lump sum, unit rate, or time and material. Then list what falls outside it, such as overtime or after-hours access.
Fix the labor rates and markup that apply to extras at the outset. Negotiating rates mid-job favors whoever holds the schedule hostage.
Tie payment to verifiable stages rather than to elapsed weeks. Stored equipment may deserve its own payment line, given what it costs.
Say when you may deduct for damage or rework. Also agree who repairs a circuit that another trade cut through.
Set how long the firm backs the installation and how fast they attend a fault. Manufacturer warranties on equipment stay with the manufacturer. Also state whether the warranty covers the labor to reach a fault, not only the repair.
Require current liability and workers compensation certificates. Then require copies of test results and certificates at closeout, while somebody still remembers where they are.
Fixing these terms costs an hour. Discovering them during an outage costs considerably more. An electrical subcontractor agreement template gives you the first version.